Haine Station1629 Haine School Road
 This station was built in 1982 and houses E21-3, R21, IC-3 and SQ21-2. The offices of the President, Chief, 2nd Captain, 2nd Lieutenant, all other Company officers are located here. It includes a meeting room with kitchen, a conference room, and a SCBA Compressor / 2 bottle fill station. Park Station20727 Route 19
 This station was constructed in 1995 and is located on Route 19 at the entrance to the community park, it houses E21-2, T21, E21, SQ21, B21, our 1928 Pirsch Pumper, and the Fire Safety House. The offices of the Assistant Chief, 1st Captain, 1st Lieutenant, Rescue Officer and Training Officer are located here. The CTVFC Relief Assocation as well as the Fire Safety and Education offices are also here. The station also has a weight room, SCBA Compressor with 3 bottle fill station, as well as a meeting room and kitchen. Training Complex
The training complex consists of: A four story tower with a full sprinkler/standpipe system, is pre-piped to be able to easily smoke up sections or the entire structure, and has an attached smoke maze with moveable walls. The roof of the smoke maze also has a section for practicing roof ventilation. The roof of the tower incudes built in anchor points for practicing rope rescue. Two concrete pads for vehicle excercises, one is piped into a propane tank for simulating vehicle fires, and the other is for practicing extrications. The next phase of the complex will include a classroom which will be large enough to hold a full class plus a vehicle.
|